| |
TM 10-3930-643-34
GENERAL SUPPORT TRANSMISSION MAINTENANCE. (cont)
15-8.
Transmission Scheduling Valve. (Sheet 2 of 7)
DISASSEMBLY
NOTE
Prepare a clean work area for
disassembly.
Maintain clean
conditions at all times
while
working on valve.
Note proper
sequence during disassembly.
Identify and segregate all
components. Do not mix parts.
1.
Using a drive socket and socket
wrench handle, remove
check valve
(1), preformed packing (2), retainer
(3), preformed packing (4), retainer
(5) and preformed packing (6) from
body (51).
Discard preformed
packings (2,4 and 6).
2.
Remove check valve (7), preformed
packing (8), retainer (9), preformed
packing (10), retainer (11) and
preformed packing (12).
Discard
preformed packings (8,10 and 12).
3. Remove check valve (13), preformed
packing (14), retainer
(15),
preformed packing (16), retainer (17)
and preformed packing (18). Discard
preformed packings (14, 16 and 18).
4.
Using a wooden dowel, remove spools
(19 thru 21).
Go to sheet 3
15-96
|