TM  10-3930-643-34 GENERAL  SUPPORT  TRANSMISSION  MAINTENANCE.  (cont) 15-8. Transmission Scheduling Valve. (Sheet 2 of 7) DISASSEMBLY NOTE Prepare a clean work area for disassembly. Maintain  clean conditions at all times while working on valve. Note  proper sequence during disassembly. Identify and segregate all components. Do not mix parts. 1. Using a drive socket and socket wrench  handle,  remove check  valve (1),  preformed  packing  (2),  retainer (3),  preformed  packing  (4),  retainer (5) and preformed packing (6) from body (51). Discard preformed packings (2,4 and 6). 2. Remove check valve (7), preformed packing  (8),  retainer  (9),  preformed packing (10), retainer (11) and preformed  packing  (12). Discard preformed  packings  (8,10  and  12). 3. Remove check valve (13), preformed packing  (14),  retainer (15), preformed  packing  (16),  retainer  (17) and preformed packing (18). Discard preformed  packings  (14,  16  and  18). 4. Using a wooden dowel, remove spools (19 thru 21). Go to sheet 3 15-96

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business