TM 10-3930-643-34
GENERAL SUPPORT TRANSMISSION MAINTENANCE. (cont)
15-2.
Torque Converter Charging Pump. (Sheet 6 of 6)
ASSEMBLY (cont)
22.
23.
24.
25.
26.
27.
28.
29.
30.
Install items 32 thru 28 as an
assembly.
Using a plastic hammer, install pins
(27, 26, 25 and 24).
Install new preformed packing
(23)
and spacer (22) with items 27 thru 24
as an assembly.
Using snap
ring pliers,
install
retaining ring (20), pin (19), gear
(18) and retaining ring (17).
Using a rubber mallet, install items
21 thru 17 as an assembly, pin
(16)
and gear (15) on drive
side of
charging pump.
Install new preformed packing
(14)
and case (13).
Using a plastic hammer, install pins
(11 and 12).
Using an 9/16 socket and socket
wrench handle, install new preformed
packing (10), plate (9), four bolts
(8), new seals (7) and screws (6) on
drive side of charging pump.
Install ring (5), new gasket (4), new
seal (3), flange (2) and three bolts
(1).
NOTE
Return M10A Forklift to
equipment condition.
original
15-22
|