| |
TM 10-3930-643-34
HYDRAULIC SYSTEM TROUBLESHOOTING AND MAINTENANCE. (cont)
12-11.
Lifting Forks and Carriage Assembly. (Sheet 15 of 15)
INSTALLATION
88.
89.
90.
91.
92.
93.
94.
95.
Using a hoist and sling,
position
carriage assembly (20).
Using a 1-1/8 socket and socket
wrench handle, install washers (19
and 18), pin (17), washer (16) and
two bolts (15).
Use washers (19 and
18) as shims to provide a maximum gap
of 0.031 inch between boom arms
and
carriage frame.
Install washers (14 and 13), pin
(12), washer (11) and bolt (10).
Install pin (12) through rod assembly
(9).
Use washers (14 and 13) as
shims to provide a gap of 0.031 inch
between lever (9) and carriage frame.
Remove hoist and sling.
Remove two plugs (8) from ends of two
hose assemblies (7).
Using quick-couplers, connect two
hose assemblies (7) to two hose
assemblies (6).
Using a 9/16
socket
and socket
wrench handle, install clip
(5),
washer (4) and bolt (3).
Install six new tie straps
(1) to
secure harness assembly (2).
NOTE
Return M10A Forklift to original
equipment condition.
12-100
END OF TASK
|