| |
TM 10-3930-643-34
HYDRAULIC SYSTEM TROUBLESHOOTING AND MAINTENANCE.
12-10. Boom Assembly. (Sheet 9 of 11)
INSTALLATION
39.
40.
41.
42.
43.
44.
45.
Attach hoist and sling to boom
assembly (40).
Position items 40 thru 38 as an
assembly on vehicle.
Position boom support (43) under boom
in vehicles S/N 2001 and above.
Using a 1-1/8 socket and socket
wrench handle, install two pins (37),
washers (36) and bolts (35).
Remove hoist and sling.
Install two pins (34), washers
(33)
and bolts (32).
Using a 7/16 socket, socket wrench
handle and rubber mallet, install
lubrication fitting (30), two
bushings (29) and new seals (28) in
lever (31), seal lips face outward.
Go to sheet
10
12-83
|