TM  10-3930-643-34 HYDRAULIC  SYSTEM  TROUBLESHOOTING  AND  MAINTENANCE.  (cont) 12-3. Loader Control Valve. (Sheet 14 of 14) TESTING/ADJUSTING  -   TILT BACK CIRCUIT RELIEF VALVE (cont) 93. 94. 95. 96. 97. 98. 99. 100. Using a 11/16” socket and socket wrench handle,   install and tighten acorn nut (61) to 10 lb-ft. Vent pressure tester hand pump, pressure on tilt cylinder, left side. Using a 10” adjustable wrench, disconnect  pressure  tester  hand  pump from sandwich test block. Using a 9/16” socket and socket wrench  handle,  remove four  bolts (54) and two flange halves (55). Disconnect hose assembly (56) from sandwich test block. Inspect new preformed packing (57), replace with new, if damaged during test. Remove  sandwich test  block  and preformed packing (57). Keep second preformed  packing  (57)  with  sandwich test block for future testing. Install new preformed packing (57), hose  assembly (56), two  flange halves (55) and four bolts (54) to tube assembly (58). NOTE Return M10A Forklift to original equipment  condition. END OF TASK 12-26

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business