| |
FRAME
10-2.
TM 10-3930-643-34
AND TOWING ATTACHMENTS MAINTENANCE.
Frame Hinge Pin and Frame Assembly. (Sheet 12 of 13)
INSTALLATION
63.
64.
65.
66.
67.
Lubricate bores with clean grease.
Using a hammer and drift punch,
install two bushings (24) on left and
rights sides of rear frame.
Lubricate bore with clean grease.
Install bushing (21), refer to step
44.
Use ports-power or equivalent
to push bushing (21) into front frame
tongue until bushing seats against
counterbore of tongue.
Lubricate bore with clean grease.
Install bushing (23) until flush
with frame ear surfaces.
Lubricate bore with clean grease.
Install bushing (22) until flush
with frame ear surfaces.
Using a 1/2 socket, socket wrench
handle and a 1/2 open end wrench,
position two new seals (20). One
seal goes on top of upper front
frame tongue and one goes below
tongue.
Cutting of new seals is
not necessary if shafts (15 or 11)
have been removed.
If shafts are
already in place, then cut new
seals and use bolts (19) and nuts
(18) to secure seals (20).
Go to Sheet 13
10-17
|