| |
TM 10-3930-643-34
BRAKE TROUBLESHOOTING AND MAINTENANCE. (cont)
8-14.
Air Compressor. (Sheet 9 of 13)
CLEANING/INSPECTION (cont)
43.
Using a feeler gage, measure ring
gap.
Gap should be 0.003 to 0.010
inches.
44.
Using a feeler gage, check clearance
of pin (25) in bushing (28).
Clearance should be 0.0002 to 0.0006
inches .
NOTE
Ensure that all match marks on
connecting rods and rod caps
are
alined and connecting
rods
are
installed on journal from
which
they were removed.
45.
Using a 1/2 socket, socket
wrench
handle,
torque
wrench,
install
connecting rod (26), new bearing
halves (19 and 21), two rod caps
(18), bolts (20) and locknuts (17) on
crankshaft (38) with Plastigage.
Tighten four bolts (20) to 9 lb-ft.
46.
Remove Plastigage and measure bearing
clearance.
Bearing clearance must be
0.0005 to 0.0020 inches.
47.
Using a
feeler gage, measure
connecting rod (26) to crankshaft
side clearance. Clearance must be
0.003 to 0.008 inches.
Go to sheet 10
8-70
|