| |
TM 10-3930-643-34
BRAKE TROUBLESHOOTING AND MAINTENANCE. (cent)
8-5.
Power Cluster (S/N 2000 and below). (Sheet 4 of 4)
INSTALLATION
10.
Using 9/16" and 11/16 open end
wrenches, install elbows (13
and 12) on power cluster (6).
11.
12.
13.
14.
15.
16.
Using an 8 pipe wrench, install
nipple (11) and coupling (10).
Using a 9/16 open end wrench,
install elbow (9).
Using an 11/16" open end wrench,
install new gasket (8) and fitting
(7).
Using a 1/2" socket and socket
wrench handle, install power
cluster and four locknuts.
Using 5/8" and 11/16" open end
wrenches, connect tube assemblies
(4, 3 and 2) to power cluster (6).
Using a 3/4 or a 1/2" open end
wrench, connect tube assembly (l).
NOTE
Return M1OA Forklift to original
equipment condition.
END OF TASK
8-20
|