TM 10-3930-643-34
GENERAL MAINTENANCE PROCEDURES.
212.
Application of Adhesives.
(2) Plastic gasket.
Plastic gasket is used as a seal on large close
fitting metal parts.
Mating surfaces must be clean and degreased.
Spread an
even coat (0.061 cubic inch per 40 square inches) on
one
of
the mating
surfaces.
Assemble and tighten bolts.
Plastic
gasket will dry in
approximately 12-24 hours.
Temperature and humidity affect drying time.
(3) Unfilled pipe sealant.
Pipe sealant MIL-S-22473D, Product CW, seals
against moderate pressures instantly and working pressures when completely dry.
Before application,
clean threads to remove oil, grease and metal chips.
Fill
the second and third threads completely for
360 degrees.
For system
cleanliness, do not fill leading thread.
Pipe sealant will dry in 6-24 hours
at room temperature.
Adjustments for elbows, gages and valves can be made up
to 24 hours after application without affecting seal.
2-9
|