| |
TM 10-3930-643-34
ELECTRICAL SYSTEM MAINTENANCE.
5-2.
Instrument Panel Wiring Harness. (Sheet
INSTALLATION
9 of 9)
52.
53.
54.
55.
56.
57.
58.
59.
60.
Install a suitable number of new tie
straps (11) to secure harness
leads
together.
Position instrument panel assembly
(4) in operators compartment; do not
install in housing.
Connect wire assemblies (10 and 9) at
connectors to front
lights cable
assembly.
Connect wire
assembly (8) at
connector to heater harness.
Connect wire assemblies (7 thru 5) at
connectors to front lights harness.
Spray all instrument panel electrical
connections
with
anti-corrosive
varnish.
Position instrument panel assembly
(4) in housing.
Install four washers (3) and screws
(2).
Connect harness
assembly (1) at
connector to intermediate harness.
NOTE
Return M10A Forklift
equipment condition.
to original
END OF TASK
5-25
|