| |
TM 10-3930-643-34
ELECTRICAL SYSTEM MAINTENANCE. (cont)
5-2.
Instrument Panel Wiring Harness. (Sheet 7 of 9)
INSTALLATION (cont)
39.
Connect lead assemblies (54 thru 51)
to lead assemblies (50 thru 47).
40.
Connect two lead assemblies (45, 44,
43 and 42) to connector (46).
41.
Connect lead assemblies (40 and 39)
to hourmeter (41).
42.
Install lamp (37) and socket (36) in
air pressure gage (38).
43.
44.
45.
46.
Connect two lead assemblies (34) to
oil pressure gage (35).
Install lamp (33) and socket (32) in
oil pressure gage (35).
Connect wire assembly (30) and seven
wire assemblies (29) at connectors to
start switch (31).
Connect wire assemblies (27 and 26)
at connectors to fan clutch
relay
(28).
Go to sheet 8
5-23
|