TM  10-3930-643-34 ENGINE,  FUEL,  EXHAUST  AND  COOLING  TROUBLESHOOTING  AND  MAINTENANCE.  (cont) 4-15. Turbocharger and Piping. (Sheet 6 of 6) INSTALLATION  (cont) 25. 26. 27. 28. 29. Using a flat tip screwdriver, disconnect protective boot (23) and remove screw (21) and washer (22). Disconnect wire assembly (24) from fuel injection pump. Crank  the  engine,  without  starting, until  oil  pressure  is  indicated  on the oil pressure gage, to provide an adequate amount of oil to lubricate  the  turbocharger  (12). Connect wire assembly (24) to the fuel injection pump. Using  a  flat  tip  screwdriver,  install washer (22), screw (21) and connect protective boot (23). Shut engine down and immediately correct  the  following  conditions: unusual  noises,  lubrication  leaks, insecure mounting, excessive vibration or smoke, 30. Operate engine and observe turbo- charger (12). 31. Using 9/16” and 1/2” sockets and socket wrench handle, tighten  all bolts,  nuts,  clamps  and oil connections. NOTE Return M10A Forklift to original equipment  condition. END OF TASK 4-106

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business