| |
TM 10-3930-643-34
ENGINE, FUEL, EXHAUST AND COOLING TROUBLESHOOTING AND MAINTENANCE. (cont)
4-15.
Turbocharger and Piping. (Sheet 6 of 6)
INSTALLATION (cont)
25.
26.
27.
28.
29.
Using
a flat tip screwdriver,
disconnect protective boot (23) and
remove screw (21) and washer (22).
Disconnect wire assembly (24) from
fuel injection pump.
Crank the engine, without starting,
until oil pressure is indicated on
the oil pressure gage, to provide
an adequate amount of oil to
lubricate the turbocharger (12).
Connect wire assembly (24) to the
fuel injection pump.
Using a flat tip screwdriver, install
washer (22), screw (21) and connect
protective boot (23).
Shut engine down and immediately
correct the following conditions:
unusual noises, lubrication leaks,
insecure
mounting,
excessive
vibration or smoke,
30.
Operate engine and observe turbo-
charger (12).
31.
Using 9/16 and 1/2 sockets and
socket wrench handle,
tighten all
bolts, nuts, clamps and
oil
connections.
NOTE
Return M10A Forklift to original
equipment condition.
END OF TASK
4-106
|