TM 10-3930-643-20
PREPARATION FOR MOVING AND STORAGE. (cont)
16-2.
Transporting. (cont)
Tiedown Procedure
4.
Eight eyes are to be used to securely tie down the vehicle.
T h e f o ur
lifting eyes are to be used along with four additional eyes, two each,
welded to both front and rear frame of loader, between center hinge
pin
and axles.
5.
Refer to Diagram B for
or air transport.
6.
Frame locking bar must
tiedown, blocking
be in position.
7.
Chains are to be used for tieing down on
and bracing data on rail,
truck
truck transport and 3/4 steel
cable in conjunction with cable tensioners for railcar transport.
8.
Before air transport, be sure cab (1), counterweights (2), muffler (3) and
forks (4) have been removed.
16-4
|