TM 10-3930-643-20
PRELIMINARY PROCEDURES. (cont)
3-5.
Organizational Preventive Maintenance
Checks and Services (PMCS). (cont)
ITEM TO BE INSPECTED
PROCEDURE:
CHECK FOR AND HAVE REPAIRED, FILLED, OR ADJUSTED AS NEEDED
PERFORM ALL OPERATOR PMCS FIRST
Q-Quarterly
A-Annually
H-Hours
I t e m I n t e r v al
No.
Q A H
Equipment
Procedure
1
10
WHEEL ASSEMBLY
2
Retighten all wheel mounting
nuts. Torque must be 280-300
lb-ft.
100
STEERING LINKAGE
Check for extensive play at the
pivot points. Replace all bent,
cracked or distorted parts of the
linkage.
3-6
|