TM   10-3930-643-20 PROPELLER  AND  PROPELLER  SHAFTS  TROUBLESHOOTING  AND  MAINTENANCE. 7-4. Propeller   Shaft   (Transmission   to   Hanger   Bearing).   (Sheet   5   of   5) ASSEMBLY 11. 12. 13. 14. 15. 16. Using   a   7/16” b o x    e n d    w r e n c h, i n s t a l l    f i t t i n g    ( 1 5 )    t o    s p i d e r    ( 6 ), f i t t i n g    ( 1 4 )    t o    s p i d er ( 4 ) ,    a n d fitting   (13)   to   slip   yoke   (12). Slide   cap   (11),   washer   (10),   new seal   (9)   and   washer   (8)   on   to stub yoke   (7) . Apply   grease   to   splines   of   stub   yoke (7)   before   assembly.   Aline   punch marks   during   assembly. Install   stub yoke   (7)   in   slip   yoke   (12). Install   cap   (11),   washer   (10),   new seal   (9)   and   washer   (8)   to   threads on   slip   yoke   (12).   Tighten   cap   (11) enough   to   prevent   leakage   when   shaft assembly   is   greased. Using   a   torque   wrench   and   1/2” socket,    install   spider   (6)   and   four bolts   (5)   to   stub   yoke   (7).   Tighten b o l t s    ( 5 )    t o    3 7    l b - f t. Install   spider   (4)   and   four   bolts (3)   to   slip   yoke   (12).   Tighten b o l t s    ( 3 )    t o    3 7    l b - f t . INSTALLATION 17. I n s t a l l    i t e m s    3    t h r u    1 5    a s    an a s s e m b l y    w i t h    f o u r    b o l t s    ( 2 )    to hanger   bearing   yoke.   Using   a   torque wrench   and   1/2”   socket,   tighten b o l t s    ( 2 )    t o    3 7    l b - f t. 18. I n s t a l l    f o u r    b o l t s    ( 1 )    t o    t r a n s- mission   front   output   yoke. Using  a torque   wrench a n d     1 / 2 ”     s o c k e t, tighten   bolts   (1)   to   37   lb-ft. Grease   all   fittings   in   drive   shaft assembly,   refer   to   LO   10-3930- 643-12. NOTE Return   M10A   Forklift   to   original equipment   condition. END OF TASK 7-19

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business