TM 10-3930-643-20
ELECTRICAL SYSTEM TROUBLESHOOTING AND MAINTENANCE. (cont)
5-47.
Battery Cables. (Sheet 6 of 6)
INSTALLATION (cont)
38.
39
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
Connect battery positive cable (24)
to slave receptacle.
Using a 9/16 socket and socket
wrench handle, install washer
(12)
and bolt (11) on slave receptacle.
Apply silicone sealant over entire
connection.
Connect ground cable (21) to slave
r e c e p t a c l e.
Install washer (10) and bolt (9) on
slave receptacle.
Apply silicone
sealant over entire connection.
Connect ground
disconnect.
Using a 9/16
install washer
cable (21) to master
open
end
wrench,
(8) and nut (7) on
master disconnect.
Apply silicone
sealant over entire connection.
Slide grommet (6) on cable end (24)
and install in wall.
Position battery ground cable
( 5 )
and connect to master disconnect.
Install washer (4) and nut (3) on
master disconnect.
Apply silicone
sealant over entire connection.
Using a 1/2 box end wrench, connect
battery positive cable (24) and
battery ground cable (5) in battery
compartment.
Connect battery cable (2).
Close battery access door
(1)
on
c e n t e r , l e f t s i d e o f v e h i c l e .
NOTE
Return M10 Forklift to original
equipment condition.
END OF TASK