TM   10-3930-643-20 ELECTRICAL   SYSTEM   TROUBLESHOOTING   AND   MAINTENANCE.   (cont) 5-34.   Front   Work   Lights,   Headlights   and   Blackout   Light.   (Sheet   6   of   6) INSTALLATION 39. Install   items   48   thru   36   and   items 35  thru  23  as  assemblies  and  bracket ( 2 2 ). 40. Using   a   3/4”   socket,   socket   wrench handle   and   3/4”   open   end   wrench, i n s t a l l    t w o    w a s h e r s    ( 2 1 ) ,    b o l ts (20),   washers   (19)   and   nuts   (18). 41. Install   washer   (17)   and   shell   (16). 42. Position   body   (15). 43. Using   a   9/16”   open   end   wrench, i n s t a l l    b r a c k e t    ( 1 4 ) ,    w a s h e r    ( 1 3) and   nut   (12). 44. I n s t a l l    i t e m s    1 7    t h r u    1 2    a s    an assembly. 45. Using   a   9/16”   socket,   socket   wrench handle   and   a   9/16”   open   end   wrench, i n s t a l l    b o l t    ( 1 1 ) ,    c l a m p    ( 1 0 ) . washer   (9)   and   nut   (8). 46. Install   lamp   (7),   bracket   (6),   clip (5),   washer   (4)   and   screw   (3). 47. Install   grommet   (2). 48. C o n n e c t    w i r e    a s s e m b l y    ( 1 )    a t connector. Apply   silicone   sealant over   entire   connection. NOTE Return   M10A   Forklift   to   original equipment  condition. END OF TASK 5-176

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business