ELECTRICAL   SYSTEM 5-34 . Front Work ASSEMBLY TM   10-3930-643-20 TROUBLESHOOTING  AND  MAINTENANCE. Lights,   Headlights   and   Blackout   Light.   (Sheet   5   of   6) 25. Position   light   assembly   (48)   on   base ( 4 7 ). 26. Using   a   3/4”   open   end   wrench, install   base   (47),   washer   (46)   and nut   (45). 27. Using   two   3/4”   open   end   wrenches, install   bolt   (44),   washer   (43)   and nut   (42). 28. Install   lamp   (41)   and   ring   (40). 29. C o n n e c t    w i r e    a s s e m b l y    ( 3 9 )    a t terminal. 30. U s i n g    a    f l a t    t i p    s c r e w d r i v e r, install   lock   washer   (38)   and   screw ( 3 7 ) . Apply   silicone   sealant   over entire   connection. 31. Pull   insulator   (36)   over   connection. 32. P o s i t i o n    h e a d l i g h t    ( 3 5 )    o n    b a se ( 3 4 ). 33. Using   a   3/4”   open   end   wrench, install   base   (34),   washer   (33)   and nut   (32). 34. Using   two   3/4”   open   end   wrenches, install   bolt   (31),   washer   (30)   and nut   (29). 35. Install   ring   (28)   and   lamp   (27). 36. Connect   wire a s s e m b l y    ( 2 6 )    at terminal. 37. U s i n g    a    f l a t    t i p    s c r e w d r i v e r, install   lock   washer   (25)   and   screw ( 2 4 ). Apply   silicone   sealant   over entire   connection. 38. Pull   insulator   (23)   over   connection. Go   to   sheet   6 5-175

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business