| |
TM 10-3930-643-20
ENGINE, FUEL, EXHAUST AND COOLING TROUBLESHOOTING ANDMAINTENANCE.(cont)
4-14
Fuel Lines. (sheet 6 of 6)
INSTALLATION (cont)
28.
29.
30.
31.
32.
Install two new tie straps (12 and
11) securing hose assemblies (14 and
13) to ether injector line.
Using a 7/16
socket and 7/16 box
wrench, install grommet (10), strap
(9), bolt (8) and nut (7) to hose
assemblies (14 and 13).
Using a 7/16
socket and 7/16 box
wrench, install sleeve (6), grommet
(5), strap (4). bolt (3) and nut (2)
to secure hose assemblies (14 and
13).
Vent fuel system and check for fuel
leaks, refer to paragraph 4-23.
Install engine side access cover (1)
to right side of engine compartment,
refer-to paragraph
NOTE
Return M1OA Forklift
equipment condition.
12-4.
t o o r i g i n a l
END OF TASK
4-56
|