ENGINE, FUEL, EXHAUST AND COOLING TROUBLESHOOTING 4-10. Oil   Lines   and   Fittings.   (Sheet   8   of   10) INSTALLATION TM   10-3930-643-20 AND  MAINTENANCE. Turbocharger   Oil   Lines 34. Install   new   gasket   (34). 35. Using   a   1/2”   socket,   socket   wrench handle   and   3/4”   open   end   wrench, install   tube   assembly   (33)   with   two w a s h e r s    ( 3 0 )    a n d    b o l t s    ( 2 9 ). C o n n e c t    t u b e    a s s e m b l y    ( 3 3 )    to fitting   (32)   on   right   side   of   engine with   nut   (31). 36. Install   new   tie   strap   (28). 37. Using   a   medium   flat   tip   screwdriver, install   clamp   (27),   nut ( 2 6 )    a nd screw   (25)0 Go   to   sheet   9 4-39

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business