TM  10-3930-638-24&P 4 - 4 .     T R A N S M I S S I O N     M A I N T E N A N C E     ( c o n t) d. Gear and Clutch Group (cont). STEP LOCATION ITEM ACTION REMARKS REASSEMBLY  (cont) Third  clutch assembly (19) f. Bearing carrier Install locating ring (18) g. Third clutch shaft Install pilot bearing (21) CAUTION Don’t force operation in next step. a. Bearing carrier (20) Position b. Third clutch Position front  bearing locating ring (16) c. Outer race roll Install pin (28) d. Piston ring outer Install race (27) e.  Bearing  carrier  locat- Contract ing ring ( 18) In bearing carrier (20) Align disc hub (23) splines with internal teeth of disc in third clutch assembly (19). Disc hub splines must be in full position  with  internal  teeth  of  all  discs On clutch assembly (19) In outer race (27) Use  contracting  type  snap  ring  pliers.  Lock pliers to hold ring in position 4-182

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business