TM  10-3930-638-24&P 3-31.   MAST   ASSEMBLY   MAINTENANCE   (cont) c. Inner and Outer Mast. This task covers: a.  Removal c. Inspection/Repair b. Cleaning d.  Installation/Replacement PERSONNEL  REQUIRED Two  maintenance  technicians INITIAL   SETUP TOOLS Chain Hoist, 1/2 ton capacity Automotive  Mechanic’s  Tool  Kit NSN 5180-00-754-0641 MATERIALS/PARTS EQUIPMENT   CONDITION Cleaning  solvent  P-D-680 Paragraph Condition  Description Clean cloths 3-3 lb Side  shifter  frame  and  rotation  bearing removed. STEP LOCATION ITEM ACTION REMARKS REMOVAL 1 Mast a. Lift cylinder assem- Remove Para 3-30e bly b. Hose and tube as- Remove Para 2-56f(2) semblies c. Two lift chains and Remove Para 2-56d pulleys d. Two stop bolts (1) Remove and lock washers (2) 2 Inner mast (3) a. Inner mast (3) Slide out of outer mast until bottom roller bearings (4) are in line with cut-outs in side of outer mast (12) b. Chain hoist Attach  and To  inner  mast  at  approximate  center take up slack WARNING Be  sure  chain  hoist  is  securely  fastened  to  inner  mast  before  perform- ing following step. Failure to do so could cause serious bodily injury by mast falling on you. c. Inner mast (3) Remove Push down at top of inner mast to disen- gage  roller  bearings  (4)  from  outer  mast (12) while lifting inner mast using chain hoist 3-259

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business