TM  10-3930-638-24&P 3-31   MAST   ASSEMBLY   MAINTENANCE   (cont) b. Side Shifter Frame and Rotation Bearing. This task covers: a.  Removal b. Cleaning PERSONNEL REQUIRED Two  maintenance  technicians INITIAL   SETUP TOOLS Chain Hoist, 1/2 ton capacity Automotive Mechanic’s Tool Kit NSN  5180-00-754-0641 Tap, 5/8-11 UNC 2B Steel  Horses  (2) MATERIALS/PARTS Cleaning  solvent  P-D-680 Clean  cloths c. Inspection/Repair d.  Installation/Replacement EQUIPMENT   CONDITION Paragraph Condition  Description Fork  assembly  grounded;  mast assembly in vertical position. 2-56f(1) Hoses, lines, and fittings between control valve and mast assembly, disconnected at mast assembly and lift cylinder assembly. 2-47 Front  axle  tires  and  wheels  removed 3-31a Carriage  assembly  removed. STEP LOCATION ITEM ACTION REMARKS REMOVAL 1 Inner  mast Chain hoist Attach To top of inner mast; take up all slack WARNING Before  performing  following  steps,  be  sure  mast  assembly  is  se- curely supported by chain hoist. Failure to do so will cause mast assembly to pivot forward on pivot mast pin which could result in bodily injury. 2 Mast assembly, a. Four retaining rings (1) Remove sides b. Two pins (2) Remove c. Tilt cylinder as- Reposition out of semblies way d. Two nuts (3) Loosen e. Two lower pivot Tap to loosen Use ten pound hammer mast pins (5) f. Two nuts (3) Remove g. Two washers (4) Remove h. Two lower pivot mast Remove pins (5) i. Two washers (6) Remove j. Two lubrication Remove fittings (7) Change   1 3-251

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business