| |
TM 10-3930-638-24&P
3-31. MAST ASSEMBLY MAINTENANCE
a. Carriage Assembly.
This task covers:
a. Removal
b. Disassembly
c. Cleaning
PERSONNEL REQUIRED
Two maintenance technicians
INITIAL SETUP
TOOLS
Chain Hoist, 1/2 ton capacity
Bar, 2 inches diameter
Bar, 1-1/2 inches diameter
Bore Gage, zero to 4 inches
Micrometer, zero to four inches
Automotive Mechanics Tool Kit NSN 5180-00-754-0641
Hard Wooden Blocks (2), 4 by 4 by 12 inches
MATERIALS/PARTS
Cleaning solvent P-D-680
Clean cloths
d. Inspection/Repair
e. Reassembly
f. Installation/Replacement
EQUIPMENT CONDITION
Paragraph
Condition Description
Engine off, parking brake applied, and
carriage assembly raised four inches
(approximately) from ground and se-
curely blocked.
2-56c
Forks removed.
2-56e
Side shift chains disconnected from
carriage assembly.
3-248 CHANGE 2
|