| |
TM 10-3930-638-24&P
3-30. HYDRAULIC LIFT SYSTEM MAINTENANCE (cont)
c. Sideshift Cylinder Assembly (cont).
STEP
LOCATION
ITEM
ACTION
REMARKS
TESTING (cont)
14
Test hydraulic
a. Start pump and Rod should extend smoothly from cylinder
pump
apply hydrau-
lic oil under
pressure
(2000 Psi) to
sideshift cyl-
inder assembly
b. Continue operat-
ing pump until
rod is complete-
ly extended
from cylinder;
hold until
step 15 below
is completed
15
Sideshift cylin-
a. Rod end port
Check for hydrau- Slight weepage of oil is permissible; if leak-
der assembly
lic oil leakage
age is too great, disassemble cylinder
and check piston assembly (14) for
damage
b. Rod end packing
Check for hydrau- If leakage is observed, disassemble cylinder
lic oil leakage
and check gland assembly (19) for damage
16
Test hydrau-
Shut pump down
lic pump
17
Sideshift cylin-
a. Cylinder port (port
Disconnect hydrau- Push rod into cylinder
der assembly
opposite rod end)
lic hose and drain
oil from cylinder
b. Both cylinder ports
Cap
Prevents intrusion of dirt
INSTALLATION/REPLACEMENT
18
Mast assembly,
a. Sideshift cylinder as-
Position on
front
sembly (11)
carriage
b. Cylinder mounting
Position
strap (10)
c. Two cap screws (8)
Install
and lock washers (9)
d. Pin (7)
Install
e. Retaining ring (6),
Install
washer (5), and
nut (4)
3-230
|