| |
TM 10-3930-638-24&P
3-30. HYDRAULIC LIFT SYSTEM MAINTENANCE (cont)
b. Tilt Cylinder Assemblies.
This task covers:
a. Removal
d.
b. Disassembly
e.
f.
c. Cleaning
INITIAL SETUP
TOOLS
No. 1 Common Organiza-
tional Maintenance Tool Kit
Chain Hoist, 1/2 ton capacity
Sleeve, 1-1/2 inches diameter
Sleeve, 1-9/16 inches diameter
MATERIALS/PARTS
Cleaning solvent P-D-680
Clean cloths
Seal repair kit
Clean hydraulic oil (refer to
current lubrication order)
Medium grit emery cloth
Inspection/Repair
Reassembly
Installation/Replacement
EQUIPMENT CONDITION
NSN 4910-00-7544654
Paragraph
Condition Description
Vehicle parked on level surface, engine
off, parking brake applied, mast vertical
and forks lowered and resting on ground.
Control valve control levers operated
several times to relieve hydraulic pres-
sure.
WARNING
If both tilt cylinder assemblies are to be removed, support mast
assembly using chain hoist attached to top of mast assembly.
Failure to do so may cause mast assembly to fall forward, striking
personnel standing/working in front of unit, This could cause
serious injury or death.
3-218
|