| |
TM 10-3930-638-24&P
3-30. HYDRAULIC LIFT SYSTEM MAINTENANCE (cont)
a. Control Valve (cont).
STEP
LOCATION
ITEM
ACTION
REMARKS
FINAL REASSEMBLY
49
Left cover
a. Three cap screws (8)
Install
In cover plate (10). Place cover plate on
plate (10)
bench
b. O-rings (3 and 4)
Position
In cover plate (10) bores
c. Rotate valve section
Position
On cover plate. Be sure O-rings are seated
(9)
in bores
50
Rotate valve
a. O-rings (3 and 4)
Position
In rotate valve section bores
section (9)
b. Shift valve section (7)
Position
On rotate valve section. Be sure O-rings
are seated in bores
51
Shift valve
a. O-rings (3 and 4)
Position
In shift valve bores
section (7)
b. Lift valve section (6)
Position
On rotate valve section. Be sure O-rings
are seated in bores
52
Lift valve
a. O-rings (3 and 4)
Position
In lift valve section bores
section (6)
b. Tilt valve section (5)
Position
On lift valve section. Be sure O-rings are
seated in bores
53
Tilt valve
a. O-rings (3 and 4)
Position
In tilt valve section bores
section (5)
b. Right cover plate (2)
Position
On tilt valve section. Be sure O-rings are
seated in bores
54
Right cover
a. Three nuts (1)
Install
Tighten to 18-22 pounds foot torque
plate (2)
b. O-ring (12)
Position
On plug (11)
c. Plug(n)
Install
INSTALLATION/REPLACEMENT
55
Operators com-
a. Control valve (10)
Position
partment,
b. Washer (9) and cap
Install
Position axle breather hose clamp on cap
control valve
screw (8)
screw (8)
mounting area
c. Lock washer (7) and
Install and tighten
nut (6)
d. Oil drip pan (5)
Position
e. Two washers (4) and
Install
cap screws (3)
f. Two lock washers (2)
Install and tighten
and nuts (1)
g. Adapter and connector
Install
Para 2-56f(1), steps 26a and 26h
h. Tube fittings
Remove caps,
Para 2-56f(1), steps 26c and 26k
connect to control
valve and tighten
i. Control valve linkage
Connect
Para 2-56b, step 1
3-216
|