| |
TM 10-3930-638-24&P
3-20. AXLES AND DIFFERENTIAL CARRIER ASSEMBLIES MAINTENANCE (cont)
c. Front Axle Differential Carrier Assembly.
This task covers:
a. Removal
b. Axle housing cleaning
INITIAL SETUP
TOOLS
No. 1 Common Organiza-
NSN 4910-00-754-0654
tional Maintenance Tool Kit
Roller Jack, 1/4 ton capacity
Jack Stands, 4 ton capacity
Container, 4 gallon capacity
Hard Wooden Blocks (2).
c. Axle housing inspection
d. Installation
EQUIPMENT CONDITION
Paragraph
Condition Description
Vehicle parked on level surface, engine
off, wheels blocked, and parking brake
applied.
2-4b(1)
Shipping lock pin installed.
2-39a
Front drive shaft assembly disconnected
6 by 6 by 18 inches
from front axle assembly differential
companion yoke.
MATERIALS/PARTS
2-43b, step 5
Brake line removed.
Cleaning solvent P-D-680
Clean cloths
Sealer (FSCM 78500 P/N 1199Q2981)
Moisture free compressed air
Crocus cloth
STEP
LOCATION
ITEM
ACTION
REMARKS
REMOVAL
1
Axle housing,
a. Container
Place under drain
Drain lubricant into 4 gallon container
bottom
plug
b. Drain plug
Remove and drain
lubricant
c. Container
Remove
Discard lubricant
3-142
|