| |
TM 10-3930-638-24&P
3-20. AXLES AND DIFFERENTIAL CARRIER ASSEMBLIES MAINTENANCE
a. Front Axle Assembly.
This task covers:
a. Removal
b. Installation/Replacement
INITIAL SETUP
TOOLS
EQUIPMENT CONDITION
No. 1 Common Organiza-
NSN 4910-00-754-0654
Paragraph
Condition Description
tional Maintenance Tool Kit
Vehicle parked on level surface, engine
Jack Stands, 4 ton capacity (2)
Chain Hoist, 10 ton capacity
off, rear wheels blocked, and parking
brake applied.
Roller Jack, one ton capacity
2-4b(1)
Shipping lock pin installed.
Hard Wooden Block (2),
2-39a
6 by 6 by 18 inches
MATERIALS/PARTS
Hose (FSCM 81343 P/N SAE30R2TYPE1-1-41D)
2-47
2-43b
Front drive shaft assembly disconnected
from front axle assembly differential
companion yoke.
Front chassis raised (use chain hoist) and
securely blocked (use jack stands).
Front wheels and tires removed.
Brake hoses, lines and fittings discon-
nected from front axle assembly housing
and wheel cylinders.
3-138
|