| |
TM 10-3930-638-24&P
2-56. HYDRAULIC LIFT SYSTEM MAINTENANCE (cont)
g. Hydraulic Reservoir (cont).
(3) Strainer. This procedure covers removal, cleaning, and installation of the hydralic reservior strainer.
INITIAL SETUP
TOOLS
EQUIPMENT CONDITION
No. 1 Common Organiza-
NSN 4910-00-754-0654
Paragraph
Condition Description
tional Maintenance Tool Kit
2-53c
Left side panel removed.
2-56g(1)
Hydraulic reservoir oil drained.
MATERIALS/PARTS
2-53f
Front cover panel removed.
Cleaning solvent P-D-680
Clean cloths
2-447
|