| |
TM 10-3930-638-24&P
2 - 4 8 . S T E E R I N G S Y S T E M M A I N T E N A N C E ( c o n t)
b. Hoses, Lines and Fittings.
This task covers: a. Removal
d. Installation/Replacement
b. Cleaning
e. Adjustment
c.
Inspection
INITIAL SETUP
TOOLS
EQUIPMENT CONDITION
No. 1 Common Organiza-
NSN 4910-00-754-0654
Paragraph
Condition Description
tional Maintenance Tool Kit
Vehicle parked on level surface, engine off,
Pressure Gage (3000 PSI maximum range)
and parking brake applied.
2-53c
Side panels removed.
MATERIALS/PARTS
2-53h
Noise baffle mat removed.
Cleaning solvent P-D-680
Clean cloths
Oil (MIL-L-2104, SAE 10)
Hose, 23 inches long (FSCM 24161 PIN 24 VW)
Tie straps (2)
2-331
|