| |
TM 10-3930-638-24&P
2-31. SENDING UNITS AND SWITCHES MAINTENANCE (cont)
d. Engine Oil Pressure Switch and Sending Unit.
This task covers: a. Removal
d. Installation/Replacement
b. Cleaning
e. Testing
c. Inspection
INITIAL SETUP
TOOLS
EQUIPMENT CONDITION
No. 1 Common Organiza-
NSN 4910-(0754-0654
tional Maintenance Tool Kit
Paragraph
Condition Description
Engine off.
MATERIALS/PARTS
IGNITION switch in OFF position and
Cleaning solvent P-D-680
key removed.
Clean cloths
2-53c
Right side panel removed.
Silicone rubber sealer
KEY
1. Harness connector
2. Nut
3. Lock washer
4. Wire lead
5. Oil pressure sender
6. Oil pressure switch
7. Tee
8. Fitting
9. In-line retainer
10. Resistor
Change 2 2-167
|