| |
TM 10-3930-638-24&P
2-30. LIGHT SYSTEMS MAINTENANCE (cont)
b. Front Blackout Light.
This task covers: a. Removal
d. Installation/Replacement
b. Cleaning
e. Testing
c. Inspection
INITIAL SETUP
TOOLS
EQUIPMENT CONDITION
No. 1 Common Organiza-
NSN 4910-00-754-0654
Paragraph
Condition Description
tional Maintenance Tool Kit
Engine off.
IGNITION switch in OFF position and
MATERIALS PARTS
key removed.
Cleaning solvent P-D-680
Clean cloths
NOTE
Two different blackout lights are used; one type
uses bulb (5), the other type uses lamp unit (11).
2-147
|