| |
TM 10-3930-638-24&P
2-28. INSTRUMENT PANEL MAINTENANCE (cont)
d. Lockout Relay.
This task covers: a. Removal
c. Inspection
b. Cleaning
d. Installation
INITIAL SETUP
TOOLS
EQUIPMENT CONDITION
No. 1 Common Organiza-
NSN 4910-00-754-0654
Paragraph
Condition Description
tional Maintenance Tool Kit
Engine off.
IGNITION switch in OFF position and
MATERIALS/PARTS
key removed.
Cleaning solvent P-D-680
2-53h
Noise baffle mat removed.
Clean cloths
STEP
LOCATION
ITEM
ACTION
REMARKS
REMOVAL
1 Instrument panel, a.
bottom center b.
c.
d.
Wire leads (1)
Tag
Wire leads (1)
Grasp and pull
From relay terminals
Two nuts (2), lock
Remove
Support relay (5)
washers (3) and cap
screws (4)
Lockout relay (5)
Lower and
From instrument panel
remove
2-135
|