| |
TM 10-3930-638-24&P
4-5. AXLE MAINTENANCE
a. Differential Carrier.
This task covers repair of the differential carrier consisting of:
INITIAL SETUP
a. Disassembly
b. Cleaning
c. Inspection
TOOLS
Field Maintenance Supplemental Tool Set No. 2
NSN 4910-00-754-0707
Shop Equip Machine Shop, Field Maint, Basic
NSN 3470-00-754-0708
Bar, two inches diameter, 6 feet long
Yoke Holding Tool
Arbor press, 1/2 ton capacity
Automotive Mechanics Tool Kit
NSN 5180-00-754-0641
No. 1 Common Organiza-
NSN 4910-00-754-0654
tional Maintenance Tool Kit
MATERIALS/PARTS
Crocus cloth
Two 3/8-16 X 2 NC cap screws
Cleaning solvent P-D-680
Clean cloths
Red lead (NSN 8010-00-243-9265)
Linseed oil
Light oil
d. Reassembly
e. Adjustment
EQUIPMENT CONDITION
Paragraph
Condition Description
3-20c, 3-20d
Differential carrier removed from axle.
Differential carrier mounted in carrier
repair stand.
Change 2 4-237
|