Click here to make tpub.com your Home Page

Page Title: REASSEMBLY (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-638-24&P
4-4. TRANSMISSION MAINTENANCE (cont)
a. Torque Converter Group (cont).
ITEM
ACTION
REMARKS
STEP
LOCATION
REASSEMBLY (cont)
Position
33
b. Bearing spacer (19)
(cont)
Install
c. Reaction member
(18)
Install
d. Retaining ring(17)
e. Locating ring (16)
Install
Install
f. Turbine(15)
WARNING
In following steps (34a through 34d), wear insulated gloves or
use tongs to handle impeller cover (10). Failure to do so could
cause you to burn your hands. Get medical aid if you burn your
hands.
Heat
34
Impeller
a. Impeller cover (10)
To 200-250 degrees F
Position
In groove in impeller cover (10)
cover
b. Retaining ring (12)
Install
c. Retaining washer (14)
Install
d. Bearing (13)
While impeller cover (10) is hot, press bear-
ing into position while spreading ears on
retaining ring (12). Align ring groove in
bearing with retaining ring (12) then re-
lease retaining ring. Check retaining
ring to be sure it is in full position in
groove
4-148

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business