|
|
TM 10-3930-638-24&P
2-31. SENDING UNITS AND SWITCHES MAINTENANCE (cont)
d. Engine Oil Pressure Switch and Sending Unit.
d. Installation/Replacement
This task covers: a. Removal
e. Testing
b. Cleaning
c. Inspection
INITIAL SETUP
EQUIPMENT CONDITION
TOOLS
NSN 4910-(0754-0654
No. 1 Common Organiza-
Condition Description
Paragraph
tional Maintenance Tool Kit
Engine off.
IGNITION switch in OFF position and
MATERIALS/PARTS
key removed.
Cleaning solvent P-D-680
Right side panel removed.
Clean cloths
Silicone rubber sealer
KEY
1. Harness connector
2. Nut
3. Lock washer
4. Wire lead
5. Oil pressure sender
6. Oil pressure switch
7. Tee
8. Fitting
9. In-line retainer
10. Resistor
Change 2 2-167
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |