|
|
TM 10-3930-638-24&P
2-15. FUEL SYSTEM MAINTENANCE (cont)
i. Accelerator//Throttle Control.
d. lnstallation/Replacement
This task covers: a. Removal
e. Adjustment
b. Cleaning
c. Inspection
INITIAL SETUP
EQUIPMENT CONDITION
TOOLS
Paragraph
Condition Description
NSN 4910-00-754-0654
No. 1 Common Organiza-
Engine off and parking brake applied.
tional Maintenance Tool Kit
Left side panel removed.
MATERIALS/PARTS
Cleaning solvent P-D-680
Clean cloths
KEY
1. Nut
2. Ball joint
3. Nuts
4. Lock washers
5. Washers
6. Cap screws
7. Clamp
8. Accelerator cable
9. Spacer
10. Nuts
11. Lock washers
12. Cap screws
13. Bracket
14. Nut
15. Lock washers
16. Cap screw
17. Clamp
18. Nut
19. Lock washer
20. Cap screw
21. clamp
22. Throttle return
spring
23. Nut
24. Washer
25. Cap screw
26. Nuts
27. Lock washer
28. Ball joint
29. Nut
30. Nuts
31. Lock washers
32. Cap screws
37.
Washers
33. Clamp
Cap screws
38.
34. Spacer
39.
Accelerator pivot bases
35. Nuts
40.
Accelerator pedal
36. Lock washers
2-66
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |