APPENDIX C
BASIC ISSUE ITEMS LIST
Section I. INTRODUCTION
C-1. Scope
Code
Explanation
This appendix lists items which accompany the forklift
use of the next higher assembly or component.
truck, or are required for installation, operation, or
X2
Repair parts, Special Tools and Test Equipment
operator's maintenance.
which are not stocked and have no foreseen
mortality. The indicated maintenance category
C-2.
General
requiring such repair parts will attempt to
This Basic Issue Items List is divided into the following
obtain the parts through cannibalization or
sections:
salvage, the item may he requisitioned with
a. Basic Issue Items - Section II. A list of items
exception data, from the end item manager,
which accompany the forklift truck, and are required by
for immediate use.
the crew/operator for installation, operation, or
G
Major assemblies that are procured with PEMA
maintenance.
funds for initial issue only as exchange
b. Maintenance and Operating Supplies-Section
assemblies at DSU and GSU level. These
IIl. A listing of maintenance and (operating supplies
assemblies will not be stocked above DS and
required for initial operation.
GS level or returned to depot supply level.
C-3. Explanation of Columns
(2) Maintenance code indicates the lowest
The following provides an explanation of columns in the
category of maintenance authorized to install the listed
tabular list of Basic Issue Items, section II.
item. The maintenance level code is:
a. Source, Maintenance, and Recoverability
Code
Explanation
Codes (SMR):
C
Crew / Operator
(1) Source code indicates the source for
(3) Recoverability code indicates whether
the listed item.
unserviceable items should be returned for recovery or
Source codes are:
salvage.
Items not coded are non-recoverable.
Code
Explanation
Recoverability codes are:
P
Repair parts. Special Tools and Test Equipment
Code
Explanation
supplied from the GSA / DSA, or Army supply
R
Applied to repair parts, (assemblies and
system and authorized for use at indicated
components special tools and test equipment
maintenance categories.
which are considered economically reparable
P2
Repair parts. Special Tools and Test Equipment
at direct and general support maintenance
which are procured and stocked for insurance
levels.
When the item is no longer
purposes because the combat or military
economically repairable, it is normally
essentialitv of the end item dictates that a
disposed of at the GS level. When supply
minimum quantity be available in the supply
considerations dictate, some of these repair
system .
parts may be listed for automatic return to
M
Repair parts. Special Tools and Test Equipment
supply for depot level repair as set forth in AR
which are not procured or stocked, as such, in
710-50. When so listed, they will be replaced
the Supply System but are to be manufactured
by supply on an exchange basis.
at indicated maintenance levels.
S
Repair parts, special tools, test equipment and
A
Assemblies which are not procured or stocked
assemblies which are economically reparable
as such, but are made up of two or more units.
at DSU and GSU activities and which normally
Such component units carry individual stock
are furnished by supply on an exchange basis.
numbers and descriptions, are procured and
When items are determined by a GSU to be
stocked separately and can be assembled to
uneconomically reparable, they will be
form the required assembly at indicated
evacuated to a depot for evaluation and
maintenance categories.
analysis before final disposition.
X
Parts and assemblies that are not procured or
T
High dollar value recoverable repair parts.
stocked because the failure rate is normally
special tools and test equipment which are
below that of the applicable end item or
subject to special handling and are issued on
component.
The failure (if such part or
an exchange basis.
Such items will be
assembly should result in retirement of the end
repaired or overhauled at depot maintenance
item from the supply system.
activities only. No repair may be accomplished
X1
Repair parts which are not procured or stocked.
at lower levels.
The requirement for such items will be filled by
C-1
|