Click here to make tpub.com your Home Page

Page Title: Figure 3-25. Tilt cylinder, exploded view.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

1. Gland nut
13.
Tube assembly
2. Wiper ring
14.
Pin
3. Packing
15.
Pin
4. Preformed packing
16.
Screw
5. Anti extrusion ring
17.
Lock washer
6. Nylon locking pellet (2)
18.
Pin
7. Piston-rod assembly
19.
Cotter pin (2)
8. Spacer ring (2)
20.
Yoke
9. Preformed packing
21.
Screw
10. Retaining ring
22.
Lock washer
11. Piston bearing
23.
Nut
12. Packing assembly
Figure 3-25. Tilt cylinder, exploded view.
c. Cleaning, Inspection and Repair.
marks. If the cylinder tube is badly scored, it must be
replaced.
(1) Clean all parts with a cleaning solvent.
(3) Inspect the piston-rod assembly for nicks,
Thoroughly flush the inside of the cylinder tube.
scratches, burrs, wear, and other damage. Inspect the
(2) Inspect the cylinder tube for dents, cracks,
piston  groove  for  rough  spots.
Remove  any
and other damage. Inspect the cylinder for score marks
or nicks. Hone the cylinder tube to remove slight score
3-40

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business