TM 10-3930-643-34 STEERING  TROUBLESHOOTING  AND  MAINTENANCE. 9-6. Control Valve and Check Valve. (Sheet 1 of 15) This task covers: a. Removal b. Disassembly c.   Cleaning/Inspection   d.   Assembly e. Installation f. Adjustment INITIAL  SETUP Tools Tool  Kit,  General  Mechanic’s Automotive NSN   5180-00-177-7033 Shop  Equipment,  Automotive Maintenance  and  Repair: Field  Maintenance,  Basic, Less  Power NSN 4910-00-754-0705 Shop  Equipment,  Automotive Maintenance  and  Repair: Field Maintenance NSN 4910-00-919-0076 Hoist and sling, capacity of 100 lbs. Personnel  Required Two  (Adjustment  only) Torques Plug (45) to 100 lb-ft. Plug (47) to 45 lb-ft. Plug (48) to 30 lb-ft. Nut (50) to 50 lb-ft. Plug (55) to 110 lb-ft. Bolts (56) to 15 lb-ft. Screws (60) to 25 lb-ft. Screw (64) to 7.5 lb-ft. Plug (76) to 7.5 lb-ft. Nut (82) to 10 lb-ft. Locknut (84) to 10 lb-ft. Materials/Parts Cleaning  solvent  P-D-680 (App. C, Item 5) Small tag (App. C, Item 28) Crocus cloth (App. C, Item 3) Lubricating oil (App. C, Item 19) Preformed  packing  (22) Seal (3) Wiper  (2) Tie strap EQUIPMENT   CONDITION References Paragraph  9-7 Condition  Description Steering  circuit  relief  valves  removed. Go to sheet 2 9-37

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business