TM  10-3930-638-24&P 2-56.   HYDRAULIC   LIFT   SYSTEM   MAINTENANCE   (cont) e. Sideshift Chains and Pulleys. This task covers: a.  Removal d.  Installation/Replacement b. Cleaning e.  Adjustment c. Inspection INITIAL SETUP TOOLS No. 1 Common Organiza- tional  Maintenance  Tool  Kit Sleeve,  2-7/32  inch  diameter by 12 inches long Arbor Press Bore  Gage,  2  inch  capacity MATERIALS/PARTS Cleaning  solvent  P-D-680 Clean cloths SAE 10 motor oil EQUIPMENT CONDITION NSN  4910-00-754-0654 Paragraph Condition Description Vehicle  parked  on  level  surface,  engine off,  parking  brake  applied,  mast  vertical, and forks resting on ground. Control  valve  control  levers  operated several times to relieve hydraulic pressure. STEP LOCATION ITEM ACTION REMARKS REMOVAL 1 Carriage assembly Two sideshift chain Remove nuts (1) 2-411

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business