TM  10-3930-638-24&P 2-52.   FRAME   AND   TOWING   ATTACHMENTS   MAINTENANCE a. Roll Over Protective  Structure. This task covers: a.  Removal c. Inspection b, Cleaning d.  Installation/Replacement INITIAL  SETUP TOOLS EQUIPMENT   CONDITION No. 1 Common Organiza- NSN  4910-00-754-0654 Paragraph Condition Description tional  Maintenance  Tool  Kit Engine  off  and  parking  brake  applied. Hoist, 1/2 ton capacity 2-30a Front flood lights removed. 2-30b Front blackout light removed. 2-53h Noise baffle mat removed. MATERIALS/PARTS Cleaning  solvent  P-D-680 Clean cloths Vinyl adhesive, one pint can (FSCM 13842 P/N 1099) Change  2  2-355

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business