TM  10-3930-638-24&P 2-15.   FUEL   SYSTEM   MAINTENANCE   (cont) i.  Accelerator//Throttle  Control. This  task  covers:  a.  Removal b. Cleaning c. Inspection d.  lnstallation/Replacement e.  Adjustment INITIAL   SETUP TOOLS EQUIPMENT   CONDITION No. 1 Common Organiza- NSN  4910-00-754-0654 Paragraph Condition  Description tional  Maintenance  Tool  Kit Engine  off  and  parking  brake  applied. 2-53c Left  side  panel  removed. MATERIALS/PARTS Cleaning  solvent  P-D-680 Clean  cloths KEY 1. Nut 2. Ball joint 3. Nuts 4. Lock washers 5.  Washers 6. Cap screws 7.  Clamp 8.  Accelerator  cable 9. Spacer 10. Nuts 11. Lock washers 12. Cap screws 13. Bracket 14. Nut 15. Lock washers 16. Cap screw 17.  Clamp 18. Nut 19. Lock washer 20. Cap screw 21. clamp 22. Throttle return spring 23. Nut 24. Washer 25. Cap screw 26. Nuts 27. Lock washer 28.  Ball  joint 29. Nut 30. Nuts 31.  Lock  washers 32. Cap screws 33.  Clamp 34.  Spacer 35. Nuts 36.  Lock  washers 37. 38. Washers Cap screws 39.  Accelerator  pivot  bases 40.  Accelerator  pedal 2-66

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business