Quantcast ALTERNATOR REPAIR/TEST - continued - TM-10-3930-673-340303

 

Click here to make tpub.com your Home Page

Page Title: ALTERNATOR REPAIR/TEST - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
ALTERNATOR REPAIR/TEST - continued - TM-10-3930-673-340302
Up
TM-10-3930-673-34 All Terrain Lifter Army System (ATLAS) 10 000 lb Capacity Manual
Next
ALTERNATOR REPAIR/TEST - continued - TM-10-3930-673-340304
TM 10-3930-673-34
(8)
Install relay terminal (33) and diode trio (27)
on rear frame (7).
(a)
Position relay terminal (33) in rear frame
(7).
(b)
Position insulator (32) and relay terminal
connector (31) on relay terminal (33).
(c)
Start nut (30) on relay terminal (33).
(d)
Position opposite side of relay terminal
connector on brush holder assembly (29).
(e)
Position diode trio (27) on rectifier bridge
assembly (21).
(f)
Install insulated screw (28) on brush
holder assembly (29).
(g)
Tighten nut (30).
(9)
Install indicator light terminal (26) on rear
frame (7).
(a)
Position indicator light terminal (26) in
rear frame (7).
TR01427
(b)
Position insulator (25) on indicator light
terminal (26).
(c)
Position stud connector (23) and washer (24) on rectifier bridge assembly (21) and indicator light terminal
(26).
(d)
Install nut (22) on indicator light terminal (26).
(10)
Install output terminal (17) and stud connector (16) on rear frame (7).
(a)
Position output terminal (17) in rear frame (7).
(b)
Position stud connector (16) on output terminal (17) and regulator (20).
(c)
Install nut (18) and nut (19).
6-9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.