Quantcast Inspection/Adjustment

 

Click here to make tpub.com your Home Page

Page Title: Inspection/Adjustment
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
BOOM EXTEND AND RETRACT CHAINS INSPECTION/ADJUSTMENT
Up
TM-10-3930-673-20-2 All Terrain Lifter Army System (ATLAS) 10 000 lb Capacity Manual
Next
BOOM HYDRAULIC HOSE AND ELECTRICAL CABLE TENSION ADJUSTMENT
TM 10-3930-673-20-2
18-23. BOOM EXTEND AND RETRACT CHAINS INSPECTION/ADJUSTMENT (CONT)
(4)
Loosen or tighten adjusting locknut (4) until
1
chain is within specifications.
(a)
Loosen jamnut (5).
(b)
Loosen or tighten adjusting locknut (4)
until chain (2) sag is within
specifications.
(c)
Tighten jamnut (5).
(5)
Retract and extend boom (1) several times
(TM 10-3930-673-10).
(6)
Recheck chain (2) sag.
O ENTER SECTION
C
F INTERMEDIATE
B
(7)
Check tension of hydraulic hoses and boom
OOM
electrical cable
C BOOM
2
HAIN SAG
5
4
TR00694
END OF TASK
18-118

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business