Quantcast Installation-CONT. - TM-10-3930-673-20-20576

 

Click here to make tpub.com your Home Page

Page Title: Installation-CONT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Installation-CONT. - TM-10-3930-673-20-20575
Up
TM-10-3930-673-20-2 All Terrain Lifter Army System (ATLAS) 10 000 lb Capacity Manual
Next
PRIORITY VALVE REPLACEMENT - TM-10-3930-673-20-20577
TM 10-3930-673-20-2
18-6. ATTACHMENT CONTROL VALVE REPLACEMENT (CONT)
(4)
Connect eight connectors (6) and gaskets (7)
on attachment valve (8).
8
(a)
Install eight gaskets (7) and connectors
(6) on valve (8).
(b)
Tighten eight screws (9).
7
6
9
TR00830
(5)
Install cover (1) on boom (2).
(a)
Position cover (1) on boom (2).
(b)
Install four washers (4), locknuts (3) on
studs (5).
NOTE
Follow-on Maintenance
Connect negative battery cable
Purge air from hydraulic system by cycling
each attachment function five times (TM 10-
2
3930-673-10).
1
5
4
3
END OF TASK
TR00831
18-42

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business