Quantcast Installation-CONT. - TM-10-3930-673-20-20287

 

Click here to make tpub.com your Home Page

Page Title: Installation-CONT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Installation-CONT. - TM-10-3930-673-20-20286
Up
TM-10-3930-673-20-2 All Terrain Lifter Army System (ATLAS) 10 000 lb Capacity Manual
Next
Installation-CONT. - TM-10-3930-673-20-20288
TM 10-3930-673-20-2
(5)
Install two electrical wires (40) and positive
5
battery cable (5) on starting motor
44
41
43
42
40
solenoid (41).
Position two electrical wires (40) and positive
battery cable (5) on terminal (44) of starting
motor solenoid (41). Install starwasher (43) and
nut (42).
TR00731
(6)
Position negative battery cable (4) in battery
4
box (2) and connect cable on STE/ICE shunt
36
(36).
39
38
(a)
Position negative battery cable (4) inside
37
2
battery box (2).
(b)
Install short end of negative battery cable
(4) on terminal (39) of STE/ICE shunt
(36) with lockwasher (38) and screw
(37).
TR00736
8-133

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business