Quantcast Installation-CONT. - TM-10-3930-673-20-20240

 

Click here to make tpub.com your Home Page

Page Title: Installation-CONT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Installation - TM-10-3930-673-20-20239
Up
TM-10-3930-673-20-2 All Terrain Lifter Army System (ATLAS) 10 000 lb Capacity Manual
Next
FLOODLIGHTS AND SPOTLIGHTS REPLACEMENT/REPAIR
TM 10-3930-673-20-2
8-30. STE/ICE SHUNT REPLACEMENT (CONT)
(3)
Install two STE/ICE electrical wires (10 and
11) on STE/ICE shunt (3).
(a)
Install STE/ICE electrical wire (11) on
terminal (18) of STE/ICE shunt (3) with
lockwasher (17), and screw (16).
(b)
Install electrical wire (10) on terminal
(15) of STE/ICE shunt (3) with washer
(14), lockwasher (13), and screw (12).
TR00539
(4)
Install ground cable (2) and negative battery
cable (1) on STE/ICE shunt (3).
(a)
Install ground cable (2) on terminal (9) of
STE/ICE shunt (3) with lockwasher (8)
and screw (7).
(b)
Install negative battery cable (1) on
terminal (6) of STE/ICE shunt (3) with
lockwasher (5) and screw (4).
NOTE
Follow-on Maintenance: Install batteries (Para
END OF TASK
TR00538
8-86

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business