Quantcast Installation-CONT. - TM-10-3930-673-20-20078

 

Click here to make tpub.com your Home Page

Page Title: Installation-CONT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Installation-CONT. - TM-10-3930-673-20-20077
Up
TM-10-3930-673-20-2 All Terrain Lifter Army System (ATLAS) 10 000 lb Capacity Manual
Next
Installation-CONT. - TM-10-3930-673-20-20079
TM 10-3930-673-20-2
5-13. FUEL SUPPLY HOSES AND TUBES REPLACEMENT (CONT)
(3)
Install fuel tube (16) on filter head (2) and
fuel pump (17).
20
18
(a)
Install fuel tube (16) on fuel pump (17).
19
15
(b)
Install seal (25), fuel tube (16), other seal
13
(25), and threaded adapter (24) on filter
21
12
head (2).
22
(c)
Install seal (22), fuel return manifold (23),
2
and other seal (22), and adapter (21) on
23
threaded adapter (24).
22
16
(d)
Install pressure sender (20) on tee (15).
(e)
Connect connector (18) to connector (19).
25
(4)
Install fuel hose (12) on filter head (2) and hi/
24
lo pressure switch (3).
25
(a)
Install adapter (13), tee (15), and elbow
16
(14) on hi/lo pressure switch (3).
17
(b)
Install fuel hose (12) on adapter (13) and
3
elbow (14).
14
TR00905
5-44

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business